...Title
MOTION TO APPROVE THE PREPARATION OF BID DOCUMENTS FOR REPLACEMENT OF WATER SERVICE PIPING IN THE CEDARWOODS AT PEMBROKE LAKES NEIGHBORHOOD.
Summary Explanation and Background
SUMMARY EXPLANATION AND BACKGROUND:
1. The Utilities Department Capital Improvement Plan (CIP) includes rehabilitation or replacement of water and sewer infrastructure that is at, or near, the end of its useful life to ensure continued, reliable service to the City’s residents and businesses. Rehabilitation/replacement projects are identified and prioritized using data that includes infrastructure age, material of construction, and operational data such as pipe failure records.
2. One such project that has been identified is replacement of the water service piping in the Cedarwoods at Pembroke Lakes neighborhood.
3. The Cedarwoods neighborhood, consisting of 595 townhomes and single-family homes, is located at the southwest corner of North Palm Avenue and Sheridan Street. The community was developed in 1977 - 1983 time range. The streets and storm drain infrastructure are privately owned by the community, but the water and sewer infrastructure is owned and operated by the City.
4. Utilities Department Staff has identified the water service lines in Cedarwoods as infrastructure that needs replacement (a water service line is the piping that connects a water meter to the water main in the street). This determination is primarily due to the frequency of failure of these lines and, secondarily, due to their age (40+ years). There are approximately 110 asphalt patches in the Cedarwoods streets that are due to water service line failures.
5. The Cedarwoods community association has expressed a desire to resurface the streets in their neighborhood and has asked Staff to consider prioritizing a project to replace the water service lines to reduce the chance of damage to their newly resurfaced streets.
6. Staff supports this request and intends to propose a budget of approximately $500,000 in the Fiscal Year 2023-2024 budget for this work. In the interim, Staff desires to commence with the preparation of bid documents in anticipation of Commission approval of the proposed budget. If the Commission approves the proposed budget for this project, Staff will then seek Commission approval to advertise the bid at a subsequent meeting.
6. Staff, therefore, recommends City Commission approval of the preparation of bid documents for replacement of water service piping in the Cedarwoods at Pembroke Lakes neighborhood.
Financial Impact
FINANCIAL IMPACT DETAIL:
a) Initial Cost: Not Applicable
b) Amount budgeted for this item in Account No: Not Applicable
c) Source of funding for difference, if not fully budgeted: Not Applicable
d) 5 year projection of the operational cost of the project: Not Applicable
e) Detail of additional staff requirements: Not Applicable.
FEASIBILITY REVIEW:
A feasibility review is required for the award, renewal and/or expiration of all function sourcing contracts. This analysis is to determine the financial effectiveness of function sourcing services.
a) Was a Feasibility Review/Cost Analysis of Out-Sourcing vs. In-House Labor Conducted for this service? Not Applicable.
b) If Yes, what is the total cost or total savings of utilizing Out-Sourcing vs. In-House Labor for this service? Not Applicable.