Title
MOTION TO RELEASE PERFORMANCE BOND #30225431 IN THE AMOUNT OF $529,585.10 (FIVE HUNDRED TWENTY-NINE THOUSAND FIVE HUNDRED EIGHTY-FIVE DOLLARS AND TEN CENTS) FROM BROOKS & FREUND, LLC; ACCEPT MAINTENANCE BOND #875300 IN THE AMOUNT OF $69,352.00 (SIXTY-NINE THOUSAND THREE HUNDRED FIFTY-TWO DOLLARS) FROM WASTE MANAGEMENT INC. OF FLORIDA; AND APPROVE THE BILL OF SALE AND EASEMENT DEDICATIONS FOR THE PROJECT “WASTE MANAGEMENT RECYCLING EXPANSION,” LOCATED AT 20701 PEMBROKE ROAD.
Summary Explanation and Background
SUMMARY EXPLANATION AND BACKGROUND:
1. Certification of Completion:
The Engineer of Record, Sun-Tech Engineering, Inc. has certified that the water, sewer, paving, and drainage systems for the Waste Management Recycling South Florida project have been completed in accordance with the approved plans and applicable City standards.
2. Inspection and Compliance:
The Engineering Division has inspected the installed water and sewer improvements and determined that they comply with the approved plans and City standards as of 08/20/24.
3. Conditions Met for Final Acceptance:
The contractor, Brooks & Freund, LLC, has satisfied all conditions required for final acceptance of the improvements. Accordingly, Performance Bond #30225431, in the amount of $529,585.10, originally posted to guarantee completion, is eligible for release.
4. Maintenance Bond Received:
Maintenance Bond #875300, in the amount of $69,352.00, has been submitted in accordance with City requirements to provide financial assurance for the correction of defects during the warranty period.
5. Bill of Sale and Easement Dedications:
As part of this agenda item, the City of Pembroke Pines will accept the utility easements necessary for the operation and maintenance of the improvements. The associated Bill of Sale conveys ownership of the water and sewer infrastructure to the City.
6. Recommendation:
Based on the successful completion of the project and staff review, the Engineering Divisio...