File #: 2023-R-46    Version: 1 Name: Proposed Resolution 2023-R-46: FDOT Utility Agreement
Type: Resolution Status: Passed
File created: 11/21/2023 In control: City Commission
On agenda: 12/6/2023 Final action: 12/6/2023
Title: MOTION TO ADOPT PROPOSED RESOLUTION 2023-R-46. PROPOSED RESOLUTION 2023-R-46 IS A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF PEMBROKE PINES, FLORIDA, APPROVING THE UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT BETWEEN THE CITY AND FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), ATTACHED HERETO AS EXHIBIT “A” AND INCORPORATED HEREIN; PROVIDING FOR UTILITY IMPROVEMENTS ALONG PINES BOULEVARD FROM 1-75 TO EAST OF NORTHWEST 118TH AVENUE; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO TAKE ANY AND ALL ACTION NECESSARY TO EFFECTUATE THE INTENT OF THIS RESOLUTION; DIRECTING THE CITY CLERK TO TRANSMIT A COPY OF THIS RESOLUTION TO FDOT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE.
Sponsors: Utility Director
Attachments: 1. 1. 2023-R-46 (FDOT Utility Work Agreement)w-MB comments (00587328-2xC4B6A).pdf, 2. 2. 446200-1_UWHCA_City of Pembroke Pines.pdf
Title

MOTION TO ADOPT PROPOSED RESOLUTION 2023-R-46.

PROPOSED RESOLUTION 2023-R-46 IS A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF PEMBROKE PINES, FLORIDA, APPROVING THE UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT BETWEEN THE CITY AND FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), ATTACHED HERETO AS EXHIBIT “A” AND INCORPORATED HEREIN; PROVIDING FOR UTILITY IMPROVEMENTS ALONG PINES BOULEVARD FROM 1-75 TO EAST OF NORTHWEST 118TH AVENUE; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO TAKE ANY AND ALL ACTION NECESSARY TO EFFECTUATE THE INTENT OF THIS RESOLUTION; DIRECTING THE CITY CLERK TO TRANSMIT A COPY OF THIS RESOLUTION TO FDOT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE.

Summary Explanation and Background

SUMMARY EXPLANATION AND BACKGROUND:

1.  The Florida Department of Transportation (FDOT) has jurisdiction over SR-820/Pines Blvd and I-75 within the corporate limits of Pembroke Pines.

2.  The FDOT is undertaking an improvement project to Pines Blvd. from the I-75 North on-ramp to east of NW 118 Ave.  The improvements generally consist of repaving and restriping the existing roadway to extend the service life, improve rideability, and minor roadway widening.

3.  Pembroke Pines owns and operates water and sewer infrastructure within the project limits, and said infrastructure is located within FDOT’s right-of-way via permit from FDOT.  Conditions of the permit include that the City must relocate or adjust its infrastructure to accommodate the construction and finished road conditions, as required.  FDOT has identified 6 sewer manholes and 40 water/sewer valve boxes that will need to be adjusted to match the finished grade of the new pavement.

4.  Utilities Staff has reviewed the required work and concludes that it would be in the best interests of the City to have FDOT’s project contractor make the utility adjustments as part of their scope of work.  The alternative would be to have the City’s utilit...

Click here for full text