File #: 19-1350    Version: 1 Name:
Type: Site Plan Status: Agenda Ready
File created: 11/7/2019 In control: Planning and Zoning Board
On agenda: 11/14/2019 Final action:
Title: SP 2019-11, Pines City Center Phase 1B - Building P-5, generally located south of Pines Boulevard and east of Southwest 103 Avenue, site plan amendment. (Joseph)
Attachments: 1. Item No. 3 (19-1350)
Title
SP 2019-11, Pines City Center Phase 1B - Building P-5, generally located south of Pines Boulevard and east of Southwest 103 Avenue, site plan amendment. (Joseph)

Summary Explanation and Background

SUMMARY EXPLANATION AND BACKGROUND:
PROJECT DESCRIPTION / BACKGROUND:

Giancarlo Cuniberti, agent for contract purchaser Terra City Center Investments, LLC seeks site plan approval for the following the addition of a perimeter building 5 (Building P-5) within City Center Commercial Phase I site with associated drive-thru, landscape, parking and traffic circulation. The proposed building is generally located south of Pines Boulevard and east of Southwest 103 Avenue. The proposed building will house a Space Coast Credit Union (bank) branch office.

The City Center phase I commercial site is located south of Pines Boulevard and east of Southwest 106 Avenue. The City Commission at its November 4, 2015 meeting approved the underlying City Center MXD zoning design guidelines (ZC 2015-04) as well as City Center Phase 1 site plan (SP 2015-06). The approved City Center phase I site plan consisted of four shopping center buildings with associated parking, traffic circulation, and landscape. The plan also provided for several grassed areas, which were contemplated as future perimeter buildings once tenants were determined.

The following perimeter buildings were later approved within this center:

Perimeter Building 1 - Burger Fi - Built
Perimeter Building 2 - City Mattress - Built
Perimeter Building 3 - Outback Steakhouse - Built
Perimeter Building 4 - Coopers Hawk - Built
Perimeter Building 6 - UFC Gym - Not Built

Perimeter Buildings 5 and 7 are under site plan consideration at tonight’s meeting. Both buildings share the same general parking area as the UFC Gym. Therefore changes made to the parking areas and landscape are reflective on both staff reports.

BUILDINGS / STRUCTURES:

The proposed +-4,000 square foot bank building will be a 1 story and 28’-3” h...