File #: 17-0572    Version: 1 Name:
Type: Zoning Status: Agenda Ready
File created: 8/7/2017 In control: Planning and Zoning Board
On agenda: 8/10/2017 Final action:
Title: SP 2017-03, Wawa at Village of Mayfair, generally located at the south of Pines Boulevard, west of Palm Avenue, site plan amendment. (Joseph)
Title
SP 2017-03, Wawa at Village of Mayfair, generally located at the south of Pines Boulevard, west of Palm Avenue, site plan amendment. (Joseph)

Summary Explanation and Background

Dwayne Dickerson agent for property owner Mayfair Land New Development Co. LLC, is requesting approval for the development of a WAWA gas station with associated parking, landscape, traffic circulation and signage; on the Raintree Commercial Shopping Center generally located at the northwest corner of Hiatus Road and Pembroke Road.

The City Planning and Zoning Board at its April 18, 2007 meeting approved the underlying multi-building Villages of Mayfair commercial center site plan for this site. Additional changes to the site have been approved over time. The site is currently still under construction. The proposed WAWA will replace approved building #1 and #2 on the previously approved site plan (SP 2015-01).

The applicant proposes the following buildings / structures on this parcel.

· A 6,119 square foot gas / retail building. The proposed 33’-4” (maximum height) building will be painted the following colors:
o Main body - Merengue #3085 (Stucco), James Hardie Harris Cream (Fiber Cement Siding)
o Exterior Stone - Cultured Stone Southwest Blend Ledgestone
o Trim / Doors - Arctic White (JH10-20), Metal Door/Panels Benjamin Moore White Diamond (BM 2121-60)
o Metal Awning - Brite Red (Atlas #17)
o Metal Roof - Coppertone (Atlas #23)

The proposed building includes the addition of 866 square feet of outdoor dining area (7 tables) along the south and east sides of the building. The outdoor dining area will be enclosed by planters.

· A 7,150 square foot gas canopy with 16 gas service positions (8 pumps. 2 service positions per pump). The proposed 25’-4” (maximum height) pitched roof structure will be painted the following colors:
o Main Body - Bone White #26
o Column Base - Cultured Stone Southwest Blend
o Metal Roof - Coppertone (Atlas #23)

The applicant proposes the follo...

Click here for full text