File #: 18-0012    Version: 1 Name:
Type: Quasi Status: Agenda Ready
File created: 1/8/2018 In control: Planning and Zoning Board
On agenda: 1/11/2018 Final action:
Title: SP 2017-13, Century Village, generally located south of Pines Boulevard and west of Flamingo Road, site plan amendment. (Joseph)
Attachments: 1. SP 2017-13
Title
SP 2017-13, Century Village, generally located south of Pines Boulevard and west of Flamingo Road, site plan amendment. (Joseph)

Summary Explanation and Background

SUMMARY EXPLANATION AND BACKGROUND:
Derek Schenavar, agent for Century Village, is requesting approval for internal roadway, parking, landscape and guardhouse entry improvements to the retirement community generally located south of Pines Boulevard and west of Flamingo Road.

The applicant is proposing the following improvements to the site:

Internal Roadway

· Selective milling and repaving of main community roadways (Southwest 136 Avenue, Southwest 129 Avenue, Southwest 10 Street/Flamingo Drive West)

o Roadways being modified to be in conformance with State and Local roadway standards.
o New pavement markings on modified roadways.
o Installation of pedestrian interconnections (sidewalks, crosswalks) where required by the Engineering Division and compliant with MUTCD standards.
o Modifications to certain medians to accommodate the proposed changes as well as to provide opportunities for additional pervious space / landscape areas.

Parking Improvements

· Asphalt Parking maintenance and curb modifications at the Clubhouse
o Installation of new curbing within the parking areas as well as the installation of new root barriers to prevent future damage to the parking lot.
o Restriping existing handicapped parking to meet ADA standards.
§ The proposed parking modifications will result in the following parking changes:


o Provide dedicated access routes to the clubhouse for handicapped parking.

Landscape Improvements

Century Village will be planting new trees and shrubs as a result of the proposed changes above, dead / dying landscape material replacements, replenishment of Pembroke Road bufferyard and general landscape mitigation on site. A summary of all landscape being provided for the areas within the scope of work is included in separate memo from the landscape architect (Debra No...

Click here for full text